No.
|
Item
|
Fig.
|
Grease
|
Procedure
|
*1
|
S3 Base U.
|
Fig. A1
|
--
|
1) Put S3 Base U on and tighten a screw.
|
*2
|
T4 Guide , Eject Lever, Pulley Cover & Pulley.
|
Fig. A2-1
|
•
|
1) Put hole of T4 Guide to hole of chassis and tighten a screw.
|
Fig. A2-2
|
•
|
2) Put Eject Lever on and a washer.
|
Fig. A2-3
|
--
|
3) Put boss of Pulley to hole of chassis on. Hole of chassis under pulley should be visible through slit of Pulley.
|
Fig. A2-4
|
--
|
4) Put Pulley Cover on Pulley and tighten 2 screws.
|
*3
|
Mode Switch , Deceleration Gears & Tension Plate.
|
Fig. A3
|
•
|
1) Put Mode Sw on.
|
•
|
2) Put Deceleration Gear (B) on
|
•
|
3) Put Deceleration Gear (A) on and a washer.
|
•
|
4) Put Tension Plate on and 2 washers.
|
4
|
Loading Motor unit & Mechanism Interface Flex.
|
Fig. A4
|
--
|
1) Put Loading Motor Unit on and tighten 2 screws.
|
--
|
2) Put Mechanism Interface Flex on and tighten 4 screws. After that, solder at terminal of Mode Sw.
|
5
|
Capstan Holder & Capstan Motor
|
Fig. A5-1
|
--
|
1) Put Capstan Motor on and tighten 3 screws. Timing Belt should be between Pulley and boss.
|
Fig. A5-2
|
--
|
2) Put Capstan Holder on and tighten 2 screws.
|
6
|
Drive Gear
|
Fig. A6
|
--
|
1) Put a washer to shaft and install Drive Gear. Timing Belt should be wound around Drive Gear. After that, confirm Timing Belt and Gear are rotated together.
|
7
|
Boat Radon
|
Fig. A7
|
•
|
1) Put hole of Boat radon to shaft of chassis.
|
8
|
Chassis Radon
|
Fig. A8
|
•
|
1) Put Chassis Radon and a washer on.
|
9
|
Cam Gear
|
Fig. A9
|
•
|
1) Put Cam Gear on. Phase Mark should be in the same line with chassis of shaft..
|
10
|
Interface Gears
|
Fig. A10-1
|
•
|
1) Put Interface Gear(C) & (D). Each phase mark should be in the same line.
|
Fig. A10-2
|
•
|
2) Put Interface Gear(A) & (B) on.
|
11
|
Tension Lever & Eject Arm.
|
Fig. A11
|
--
|
1) Put boss of Tension Lever into slit of Cam Gear and Tension Plate, then tighten a screw.
|
2) Put boss of Eject Arm into slit of Cam Gear. Put a washer on shaft of chassis.
|
12
|
Pinch Beetle & Release Beetle
|
Fig. A12
|
•
|
1) Put boss of Pinch Beetle into slit of Mode Sw.
|
2) Put boss of Release Beetle into slit of Mode Sw.
|
3) Put a washer on.
|
13
|
Gear Cover
|
Fig. A13
|
--
|
1) Keep sliding Gear Cover and put it on.
|
2) Tighten a screw.
|
14
|
T-Loading Gear & S-Loading Gear
|
Fig. A14
|
•
|
1) Put S-Loading Gear on.
|
2) Put T-Loading Gear on. Each phase mark should be in the same line.
|
15
|
Rail Unit
|
Fig. A15-1
|
--
|
1) Make half loading until Connection Arm comes out.
|
Fig. A15-2
|
--
|
2) Connect Arm of S & T Loading Gear and Connection Arms. a) Hold Loading Gear side. b) Push Arm of S & Tloading Gear into slit of connection arms.
|
Fig. A15-3
|
--
|
3) Tighten 4 screws.
|
16
|
Pinch Arm & Center Gear
|
Fig. A16-1
|
--
|
1) Put Center Gear Spacer on shaft of chassis.
|
2) Put Center Gear on.
|
Fig. A16-2
|
•
|
3) Make full loading position and put Pinch arm on, then put a washer on.
|
17
|
Sub Chassis Unit
|
Fig. A17-1
|
--
|
1) Make unloading position until moving Release Beetle Confirm spring is exist.
|
Fig. A17-2
|
2) Put Sub Chassis Unit on as pre-installation.
|
Fig. A17-3
|
3) Tighten 3 screws. Make Loading position until 1 screw position appears, then tighten a screw.
|
Fig. A17-4
|
4) Tighten a screws at Flex Holder portion and Hook spring back to Pinch Arm.
|
18
|
LED Holder, Cover plate & Idler U.
|
Fig. A18-1
|
--
|
1) Put Idler U into shaft of Drive Gear.
|
Fig. A18-2
|
--
|
2) Put Cover Plate on and tighten 5 screws, then hook 2 springs to 2hooking portion of Sub chassis. And also put LED Flat Cable back.
|
Fig. A18-3
|
3) Put LED Holder back.
|
19
|
Confirmation of Mechanism movement , Cylinder Unit & RT Flex. Flame.
|
Fig. A19-1
|
--
|
1) Confirm loading and unloading is smooth.
|
Fig. A19-2
|
--
|
2) Put Cylinder Unit & Spring on and tighten 3 screws.
|
FIg. A19-3
|
--
|
3) Put RT Flex. Flame on and tighten 2 screws.
|
*20
|
H Amp Unit. (Only Q1 & Q2)
|
Fig. A20-1
|
--
|
1) Put H Amp Unit on and tighten a screw at bottom of chassis.
|
Fig. A20-2
|
2) Connect Cylinder Flex to connector.
|
Fig. A20-3
|
3) Put Shield case on and tighten a screw.
|
21
|
Cassette Up Unit.
|
Fig. A21-1
|
--
|
1) Put both S &T sides to coupling portion on.
|
Fig. A21-2
|
2) Tighten 3 screws. (Q1 &2 have 4 screws)
|
* 1) Procedure 20 for H.Amp Unit is applied only Q1 & Q2 mechanism.
2) Procedure 1 - 3 can be changed in order.